FACILITIES AND LOGISTICS
Vision agents for workplace safety and security
Security teams cannot watch every camera. Wexa built vision agents that detect intrusion, loitering, falls and known persons on existing CCTV, and send each event with evidence to a person for review.
- detection on a CPU, no GPU needed
- p95 per frame for the full 1080p pipeline
- incident types plus cross-camera re-identification
- of events reviewed by a person
- CLIENT
- Warehouse and facilities operator
- REGION
- India
- WHEN
- 2026
- ENGAGEMENT
- Proof of concept
- WEXA COMPONENTS
- Vision models at the edge · incident engine · Wexa workbench · human review
01Case 29
The challenge
- Too many cameras for operators to watch
- Incidents noticed after the fact
- Privacy law on face data
What Wexa built
- Detection, tracking, pose, zones, faces and re-identification on CCTV, RTSP or video files
- Incident engine writing events with evidence images and model versions, pending review
- Edge-deployable: CPU container today; GPU, Jetson and mobile targets documented
- Privacy by design: consented gallery only, unknown faces never stored, retention rules
02Case 29
How it runs on Wexa
03Case 29
Vision pipeline
04Case 29
Results
| Measure | Before / without Wexa | With Wexa |
|---|---|---|
Camera-monitoring operators across three shifts | 24 operators | 8 operators |
Annual cost of the process | $216K | $72K |
Losses from theft and safety incidents avoided per year | – | $150K |
Time to implement the AI solution | 6 months | 4 weeks |
AI build cost (one-time) | $480K | $30K |
AI operating cost per year (models, infrastructure, upkeep, platform) | $312K | $166K |
Total AI cost in year 1 | $792K | $195K |
With Wexa
net annual value to the client after Wexa's own operating cost
faster to implement
lower AI operating cost
less AI spend in year 1
- Became the VisionOps track of the October 2026 hackathon
More case studies
All 43 casesFinancial services logistics
ATM cash-out prediction · cash logistics
~3 days
to build and deploy the working POC
Working POC built in about 3 days for the client's CTO
Read the caseTelecom / optical networking
Design documents from manuals · optical networking
60%
of sections accepted at the interim review
Agents writing structured design documents live; 60% section-level success at interim review
Read the caseInsurance
Underwriting analytics · insurer
−40%
underwriting time
Underwriting time −40%; standardized risk scoring
Read the caseWant results like these?
Book a 30-minute call and we will map your workflow to this case.