E-COMMERCE RETAIL
Catching short-ships before the customer does, for an online supplement retailer
The retailer buys just in time from distributors, so some orders cannot be filled and customers find out late. Wexa built two agents that check stock across the retailer's shelf and distributor DCs, and offer an equivalent product before the customer has to ask.
- agent flows: stock check and substitution
- ERP tables integrated with the storefront
- of outbound customer emails approval-gated
- disease claims: regulatory wording guardrail
- CLIENT
- US online nutritional-supplement retailer (just-in-time from distributors)
- REGION
- US
- WHEN
- 2026
- ENGAGEMENT
- Solution build
- WEXA COMPONENTS
- Wexa SDK · e-commerce and ERP connectors · context graph · 2 agent flows · approval gate
01Case 20
The challenge
- Distributor short-ships discovered by the customer
- Substitutions decided by hand, product by product
- Supplement marketing rules on what an email may claim
What Wexa built
- Storefront order → ERP → stock-check agent across own shelf and distributor DCs, using fill-rate history
- Substitution agent: same primary ingredient, comparable dose, ships today, never costs more
- Customer offer page: swap, wait or cancel; ERP and storefront updated
- Compliance guardrail blocks disease claims and appends the required disclaimer
- Multi-tenant: each Wexa project is its own store; deployed on Kubernetes
02Case 20
How it runs on Wexa
03Case 20
Results
| Measure | Before / without Wexa | With Wexa |
|---|---|---|
Short-shipped orders lost or handled by hand each month | 600 orders, 1 FTE | 240 orders, automated |
Annual cost of the process | $351K | $131K |
Time to implement the AI solution | 4 months | 4 weeks |
AI build cost (one-time) | $192K | $15K |
AI operating cost per year (models, infrastructure, upkeep, platform) | $141K | $69K |
Total AI cost in year 1 | $333K | $84K |
With Wexa
net annual value to the client after Wexa's own operating cost
faster to implement
lower AI operating cost
less AI spend in year 1
More case studies
All 43 casesSteel and heavy manufacturing
Asset reliability · specialty steel
€1.12M
potential savings identified
€1.12M of potential savings identified across 5 sites; one predicted failure worth ~€350K
Read the caseWater utilities
OT / SCADA retrofit · water utility
5
sites modelled: treatment works and boosters
Working retrofit over 5 sites; every action tiered, PLC interlocks stay the final authority
Read the caseIndustrial manufacturing
Governed ERP actions · industrial manufacturer
34% → 100%
ERP writes passing a policy gate
Policy-gated ERP writes 34% → 100% target; context tokens per query 194K → 3.5K
Read the caseWant results like these?
Book a 30-minute call and we will map your workflow to this case.